
Reducing the Risk
There are many steps of a build process that can increase the risk to a wood floor.
Long construction periods between installation and permanent heating systems being commissioned mean that floors can pick up too much moisture before being dried too rapidly causing gaps, splits, and delamination occurring just before project handover.